Copyright © HT Media Limited
All rights reserved.

HT Auto wants to start sending you push notifications. Click allow to subscribe

Tesla will not start German mass battery production before 2024: Report

  • Tesla plans to build a battery cell plant in Gruenheide in the long term.
File photo of Tesla electric vehicles (MINT_PRINT)

Tesla will not start mass production of battery cells at its European gigafactory near Berlin before 2024, German business daily Handelsblatt reported on Friday, citing experts, two of whom are close to the company.

According to the report, problems have been discovered with an important production process presented by Tesla Chief Executive Elon Musk two years ago. Tesla spokespeople in Germany were not immediately available for comment.

Currently, battery research at the site in Gruenheide only covers electrodes, while all equipment for the remaining production steps of winding, assembling and formatting the cells are being moved to Tesla's headquarters in Texas, the report said.

Also Read : Tesla slashes Model 3 and Y delivery time again in China, third time in a month )

At full capacity, the Gruenheide plant, which is still in the ramp-up phase, will produce 500,000 cars a year, more than the 450,000 battery-electric vehicles that German rival Volkswagen sold globally in 2021.

It will also eventually generate 50 gigawatt hours (GWh) of battery cells, but Tesla has not communicated a timeline for that part of production. Shares of Tesla were down 5.5% in midday U.S. trade.

Also check these Cars

Find more Cars
UPCOMING
Tesla Model 3
BatteryCapacity Icon82kWh Range Icon 555 km
₹ 70 - 90 Lakhs
UPCOMING
Tesla Model S
BatteryCapacity Icon75 kWh Range Icon396 km
₹70 Lakhs - 1 Cr
Lexus ES
Engine Icon2487.0 cc FuelType IconMultiple
₹ 56.55 - 62.19 Lakhs
BMW i4
BatteryCapacity Icon83.9 kWh Range Icon493 Km
₹ 69.90 Lakh
Hyundai Creta
Engine Icon1497 cc FuelType IconMultiple
₹ 11 - 20.15 Lakhs

Also Read : Tesla CEO Elon Musk shares ideas on how Cybertruck can act as a boat )

Tesla still plans to build a battery cell plant in Gruenheide in the long term, the report said, adding the company has to get a grip on the so-called dry coating of the electrodes before that can happen. While tests with the technology are currently running successfully there is a lack of implementation in large-scale production, the report said.

First Published Date: 15 Oct 2022, 10:10 AM IST
Similar Stories
NEXT ARTICLE BEGINS