Copyright © HT Media Limited
All rights reserved.

HT Auto wants to start sending you push notifications. Click allow to subscribe

Toyota suspends work at Bidadi plant for a day after worker succumbs to Covid-19

The deceased employee had last attended work at the Toyota factory on June 23.The company has quarantined the employees suspected of having primary or
...
Toyota has said as a precautionary measure, it has carried out the required process of disinfecting the workplace. (Bloomberg)

Toyota Kirloskar Motor (TKM) on Monday said it has suspended operations at its manufacturing plant in Bidadi for a day following the death of an employee due to Covid-19.

The company deeply regrets to inform the sad news of an untimely demise of one of its employees and expresses its sincere condolences to the family, friends and colleagues of the deceased employee, TKM said in a statement.

The cause of death has been identified as Covid-19, it added.

The employee had last attended work at the factory on June 23and hence as of now there has been no clear evidence of internal transmission within the company from this case or the previously reported eight Covid-19 positive cases at the plant, TKM said.

In line with the government guidelines, the company has quarantined the employees suspected of having primary or secondary contact with the deceased until June 23, it added.

Also Read : Toyota sells 3,866 units in June, down from 10,603 units a year earlier

Also check these Vehicles

Find more Cars
UPCOMING
Toyota Camry 2024
Engine Icon2487 cc FuelType IconPetrol
₹ 50 Lakhs
UPCOMING
Toyota bZ4X
BatteryCapacity Icon72.8 kWh Range Icon405 Km
₹ 70 Lakhs
Toyota Glanza
Engine Icon1197.0 cc FuelType IconMultiple
₹ 6.86 - 10 Lakhs
UPCOMING
Toyota Belta
Engine Icon1462 cc FuelType IconPetrol
₹ 10 Lakhs
Toyota Camry
Engine Icon2487.0 cc FuelType IconMultiple
₹ 46.17 Lakhs
Toyota Fortuner
Engine Icon2755 cc FuelType IconMultiple
₹ 33.43 - 51.44 Lakhs

The automaker as a precautionary measure has suspended its production for the day and has carried out the required process of disinfecting the workplace, TKM said.

The company will resume operations at the plant on July 7 post confirming the safety of the workplace and adhering to all the mandatory protocols, it added.

First Published Date: 07 Jul 2020, 09:32 AM IST
Similar Stories
NEXT ARTICLE BEGINS