Delhi's Sarai Kale Khan flyover extension, sans traffic signals, inaugurated

  • The Sarai Kale Khan flyover extension has been built at the cost of 50 crore, and consists of three lanes, ramps, stilt sections, and U-turn loops.
Sarai Kale Khan
The 620-meter-long half-flyover is free from traffic signals, promising a smooth ride for city dwellers. (HT)
Sarai Kale Khan
The 620-meter-long half-flyover is free from traffic signals, promising a smooth ride for city dwellers.

Delhi Chief Minister Arvind Kejriwal inaugurated a three-lane extension of the Sarai Kale Khan flyover extension on Sunday. The 620-meter-long half-flyover is free from traffic signals, promising a smooth ride for city dwellers. It will connect Southeast Delhi and ITO, reducing travel time between the two areas as well as reducing traffic jams on the T junction.

The flyover has been built at the cost of 50 crore, and consists of three lanes, ramps, stilt sections, and U-turn loops. Its upper ramp is about 90 meters long, lower ramp is 95 metres long and the stilt section is approximately 360 meters long. The flyover will impact journey between South East Delhi, Sarai Kale Khan, ITO, IP, Pragati Maidan, and routes towards East Delhi, making them smooth and free from congestion.

Also check these Vehicles

Find more Cars
Mahindra Ekuv100 (HT Auto photo)
UPCOMING
BatteryCapacity Icon40 kWh Range Icon150 Km
₹ 8.25 - 10 Lakhs
View Details
Mahindra S204 (HT Auto photo)
UPCOMING
₹ 12 Lakhs
View Details
Lexus Ux 300e (HT Auto photo)
UPCOMING
BatteryCapacity Icon 54.3kWh Range Icon400 km
₹ 75 - 85 Lakhs
View Details
Hyundai Kona Electric 2024 (HT Auto photo)
UPCOMING
BatteryCapacity Icon64.8 kWh Range Icon418 Km
₹ 25 Lakhs
View Details
Maruti Suzuki Xl5 (HT Auto photo)
UPCOMING
Engine Icon998 cc FuelType IconPetrol
₹ 5 Lakhs
View Details
Tata Sierra Ev (HT Auto photo)
UPCOMING
BatteryCapacity Icon69 kWh Range Icon420 Km
₹ 25 - 30 Lakhs
View Details

Also Read : Delhi government extends EV policy till December 31

The flyover will play a significant role in reducing congestion at the Sarai Khan inter-state bus terminal as well. "In this project, we were sanctioned 66 crore, but we completed it for 50 crore. This will provide convenience to those who travel from ITO to Ashram," Kejriwal said while addressing a gathering after the inauguration.

The minister congratulated and thanked everyone involved in the construction of the flyover, including PWD officials, engineers, contractors, agencies, and workers. He stated that since 1947 till date, 102 flyovers and underpasses have been constructed in the national capital. "As our next step, we're studying every main point of traffic jams in Delhi. Based on this study, we'll construct the U-turns, flyovers, etc as per the need to make Delhi traffic jams-free," he added.

First Published Date: 23 Oct 2023, 12:04 PM IST
NEXT ARTICLE BEGINS

Please provide your details to get Personalized Offers on

Choose city
+91 | Choose city
Choose city

Want to get the best price for your existing car?

Powered by: Spinny Logo
By clicking "View Offers" you Agree to our Terms and Privacy Policy
Dear Name

Please verify your mobile number.

+91 | Choose city
Couldn't verify the OTP.
It's either expired or it's incorrect.