Copyright © HT Media Limited
All rights reserved.

HT Auto wants to start sending you push notifications. Click allow to subscribe

In pics: Scenic 10-lane Bengaluru-Mysuru expressway inaugurated

  • Vehicles using the Bengaluru-Mysuru expressway are expected to be charged 135 as toll fees.
1/9 The Bengaluru-Mysuru Expressway project is 118-Kilometre-long and has been developed at a total cost of around 8,480 crore. (ANI Pic Service)
2/9 The 10-lane highway will decrease the travel time between Bengaluru and Mysuru from around three hours to about 75 minutes now. (ANI Pic Service)
3/9 The expressway will also serve other purposes such as acting as a catalyst for socio-economic development in the region.

Also check these Vehicles

Find more Cars
UPCOMING
Mahindra Ekuv100
BatteryCapacity Icon40 kWh Range Icon150 Km
₹ 8.25 - 10 Lakhs
Porsche 911 GT3
Engine Icon3996.0 cc FuelType IconPetrol
₹ 2.50 Cr
Lexus NX
Engine Icon2494.0 cc FuelType IconMultiple
₹ 64.90 - 71.60 Lakhs
UPCOMING
Rolls-Royce New Ghost
Engine Icon6750 cc FuelType IconPetrol
₹ 6.95 - 7.95 Cr
4/9 The 10-lane Bengaluru-Mysuru Expressway was officially inaugurated by Prime Minister Narendra Modi.
5/9 The expressway will have four rail overbridges, nine large bridges, 40 minor bridges, and 89 underpasses and overpasses.
6/9 The 10-lane Bengaluru-Mysuru expressway starts from the NICE entrance in Bengaluru and ends at ring road junction in Mysuru. (Nitin Gadkari Twitter)
7/9 The expressway  has been designed to achieve a speed of 110 to 120 kilometres per hour. (ANI Pic Service)
8/9 The speed limit on the expressway is expected to be between 100 kmph and 120 kmph. (PTI)
9/9 For safety purposes, NHAI has banned two and three-wheelers from using the expressway after toll fees are implemented. (ANI Pic Service)
First Published Date: 13 Mar 2023, 10:43 AM IST
Similar Stories
NEXT ARTICLE BEGINS