4/9 The 10-lane Bengaluru-Mysuru Expressway was officially inaugurated by Prime Minister Narendra Modi.
5/9 The expressway will have four rail overbridges, nine large bridges, 40 minor bridges, and 89 underpasses and overpasses.
6/9 The 10-lane Bengaluru-Mysuru expressway starts from the NICE entrance in Bengaluru and ends at ring road junction in Mysuru. (Nitin Gadkari Twitter)
7/9 The expressway has been designed to achieve a speed of 110 to 120 kilometres per hour. (ANI Pic Service)
8/9 The speed limit on the expressway is expected to be between 100 kmph and 120 kmph. (PTI)
9/9 For safety purposes, NHAI has banned two and three-wheelers from using the expressway after toll fees are implemented. (ANI Pic Service)